Hero Rooftop Energy Private limited, subsidiary of Hero Future Energies Pvt. Ltd (hereinafter referred to as "Hero Future"), plans to develop a 175.6 MW wind-solar hybrid project in Gadag region of Karnataka. The project will comprise of 75.6 MW of wind power plant connecting a total of twenty three (23) wind turbine generators (WTGs) and 100 MW of solar power plant.
Key Observations:The proposed Hybrid Power Project will be connected to to the 220KV side of the 220KV/400KV Doni KPTCL substation which is located approx.1km from the project site. The project is currently in its pre-construction phase, with ongoing land acquisition. Only the boundary wall for the solar site is being constructed. For solar project out of the total land area of 450 acres, approximately 330 acres have been leased through a lease deed agreement for the project and remaining 120 acres is under acquistion.
For the Wind Project, each WTG requires 6 acres 30 gunta (means 6.75 acres) of land, with 5 WTGs completed out of 23. As conveyed by the project proponent, out of the total 6 acres 30 gunta, 1 acre is under a sale deed and the remaining 5 acres 30 gunta are acquired through a lease deed agreement. Additionally, for pathway access, a settlement was based on mutual understanding, with a one-time settlement agreed upon per gunta.
The Doddabasappa Temple and Someshwara Temple, located in the Dambal village Gadag district of Karnataka, is a state-protected monument. It is officially recorded on the ASI (Archaeological Survey of India) under the category of Protected Monuments in Karnataka. However, both of these sites listed by the Archaeological Survey of India (ASI) are situated at a distance of 250 meters from the project sites.
Inference: The assignment is in progress.