WTE Power Plant North Dhaka Private Limited plans to establish a waste-to-energy power plant in the Dhaka district of Bangladesh, situated on the north side of the Dhaka-Aricha Highway. The plant's primary purpose is to generate electricity based on the national electricity demand. The electricity generated will be transmitted to the existing Savar 132/33 kV Substation through a double-loop 132 kV line, extending approximately 6 kilometers. This Project is in line with the country's initiatives to produce electricity from waste, diversify renewable energy sources, and enhance waste management practices. By effectively managing municipal solid waste, the Project aims to contribute to a cleaner city and increase the share of electricity from renewable sources in the national energy mix.
The proposed power plant, with a capacity to generate 42.5 megawatts of electricity, will require 3,000 metric tonnes of solid waste per day. Implementation of the Project is expected to take 24 months from the required financial closing date, which is anticipated to occur within nine months of the Project's commencement.
Key Observations:
• According to the DC office, out of total 242 impacted landowners, 138 landowners have received compensation in line with ARIPA, 2017 act and remaining 104 landowners yet to receive compensation from DC office.
• Furthermore, ARIPA 2017 does not provide compensation to impacted non-titled holders, which leaves a gap in addressing the needs of this group. In contrast, the rag pickers affected by the Project were identified as vulnerable based on their livelihood and income dependency.
• Regarding information related to land acquisition for Transmission Line, a total of 27 Tower wise land details such as type of land, price of land, details of vegetable grown and other relevant technical details are presented in TL Section 2.18.6 of the revised ESIA report but it lacks the details of impacted landowners, area of land parcel against each land owners, socio-economic condition and compensation amount for each landowner as well as share cropper not mentioned in the ESIA report.
• Additionally, feedback from community stakeholders highlighted concerns about a persistent foul odour emanating from the Project area. This issue has been reported by several members of the local community as a source of discomfort. Furthermore, it was observed that the TL will cross the Karnatali River at two points. The presence of black kites and raptors, particularly near the landfill area, raises concerns about the potential risk of bird electrocution. These species are frequently observed in the vicinity of the proposed TL route, particularly near the landfill.
• Given the severity of the impact due to the land acquisition exercise, an income cum livelihood restoration plan has been proposed in line with entitlement matrix to address the issue of non-titled holders as well as vulnerable rag pickers adhering to AIIB’s ESS-2 guidelines.
Inference: The assignment is in progress.