Critical Habitat Assessment for a Solar-Wind Hybrid Project at Sheo Rajasthan

ECOGENESIS Project Project Details

The Critical Habitat Assessment (CHA) for the 154.5 MW Solar-Wind Hybrid Project in Sheo, Barmer district, Rajasthan, identifies key biodiversity and conservation concerns related to the project area and its 50 km area of influence (Ecologically Appropriate Area of Analysis, EAAA). The project site lies within the potential habitat zone for the Critically Endangered Great Indian Bustard (GIB), and supports significant populations of endangered species like the Egyptian Vulture, along with migratory and congregatory species such as the Demoiselle Crane. The CHA highlights risks such as bird collisions, habitat disturbance, and electrocution, especially due to transmission infrastructure. Mitigation measures including bird diverters on power lines, turbine blade visibility enhancement, habitat management, and ongoing monitoring are recommended. The study underscores the importance of balancing renewable energy development with biodiversity conservation.

Key Observations:
  • Project located in GIB Potential Area; home to globally significant populations of GIB (~85% of global population), Egyptian Vulture, and Demoiselle Cranes. No protected areas within 50 km but Desert National Park (57 km away) identified as critical habitat for GIB and vultures
  • Population movements show GIB breeding in enclosures and dispersal beyond priority areas, risking collision with power infrastructure. Egyptian Vultures prevalent in Degrai Oran (~150+ individuals sighted); Demoiselle Cranes congregate in large numbers nearby (e.g., Khichan IBA). Steppe Eagle and Saker Falcon present but below critical habitat thresholds.
  • Major threats include collision and electrocution by power lines, habitat loss, disturbance, and poisoning.
  • Recommended mitigation: bird diverters on power lines per Supreme Court and NGT guidelines, blade painting, anti-reflective solar panels, carcass removal, and staff training.
  • Continuous biodiversity monitoring and adaptive management during construction and operation phases emphasized